For most paving jobs, you need both sand and aggregate, not one instead of the other. Compacted aggregate (road base) forms the structural foundation underneath, while sand creates a smooth bedding layer for the pavers and fills the joints between them. Skipping either layer is the most common cause of pavers shifting or sinking over time.
Sand and aggregate for paving aren’t competing options. Instead, they do two different jobs in the same paving job. Road base, a type of crushed aggregate, forms the compacted structural layer that carries the load. Meanwhile, it creates a smooth, level surface for the pavers themselves. Most paving failures happen because someone skips one of these layers, not because they chose the wrong material.

Aggregate is crushed rock, gravel, or recycled material that builds structural strength. Road base is the most common aggregate under paving. Its mix of particle sizes locks together tightly once compacted. Sand, by contrast, is much finer. It won’t lock together the same way under load. That’s exactly why sand can’t replace aggregate as a structural base.
However, sand does a different job. It fills small gaps and creates an even surface, which is exactly what pavers need to sit flat and level. Confusing the two, or trying to make one do the other’s job, is where paving problems usually start. Understanding this distinction upfront saves a lot of guesswork later.
Because pavers need both structure and a level surface, a paving job typically needs three layers, not one. First comes the compacted road base. This spreads the load and stops the ground underneath from shifting. Next comes a bedding sand layer, which levels out any small irregularities in the road base. Finally, the pavers go down, and installers sweep more sand into the joints afterwards to lock them together.
Skipping the road base layer is the single most common mistake among DIY pavers. This happens most often when the existing ground already feels firm underfoot. However, natural soil compacts and shifts differently to a properly graded road base, even when it feels solid. This is exactly the debate that plays out again and again across paving forums. Installers almost always resolve it the same way: lay the base.
Road base is a blended mix of crushed rock in a range of particle sizes. That blend is exactly what allows it to compact into a dense, stable layer. Cement Concrete & Aggregates Australia, the peak body for Australia’s heavy construction materials industry, publishes guidance on residential pavement construction that covers subgrade and subbase compaction in detail, treating proper compaction as fundamental to how long a pavement lasts. Consequently, a poorly compacted base settles unevenly over time. It takes the pavers down with it.
Since ground conditions vary, road base under residential paving is commonly laid between 50mm and 100mm deep, depending on the product and the load it needs to carry. Driveways carrying vehicle weight generally need a deeper base than a foot-traffic-only path or patio. The load moving across a driveway is far greater, so the base needs to work harder.
Recycled aggregate is worth considering too, particularly for homeowners who want a more sustainable option. It’s made from crushed concrete and masonry rather than freshly quarried rock. Road authorities in New South Wales, Victoria and South Australia all include recycled crushed concrete in their official base-material specifications, and research has found it can match or exceed virgin road base on structural performance once compacted properly.
Once you compact the base, lay a bedding sand layer next. This commonly sits around 30mm to 40mm deep, though the right depth depends on the product and the paver type. For example, washed river sand is a solid choice for this layer, since its coarser, washed particles compact evenly without holding excess moisture underneath the pavers. Brickies sand is a different product entirely. It’s a fine mortar sand made for bricklaying, not for bedding pavers, and using it here is one of the mix-ups covered below.
That same washed sand, brushed into the joints after the pavers go down, locks them together. It stops individual pavers shifting under foot or vehicle traffic. Skipping this step, or using a sand that’s too fine, is one of the more common reasons pavers start to rock or separate within the first year.
Picture a 20-square-metre courtyard getting paved with concrete pavers. Workers spread the road base first, at roughly 75mm deep, then compact it firmly with a plate compactor. A 30mm bedding sand layer follows, screeded level before a single paver goes down. Once the pavers sit in place, workers sweep more sand into the joints and compact everything a final time.
A larger job scales the same way. A 50-square-metre driveway at the same depths needs roughly 3.75 cubic metres of road base and 1.5 to 2 cubic metres of bedding sand, plus a small buffer for the joints. Builders and landscapers often use this same rough ratio to quote a job quickly, without recalculating every layer from scratch.
Therefore, getting the quantities right before ordering avoids a stop-start job. This matters particularly since suppliers quote and deliver aggregate and sand separately. As of 2026, checking the delivery information page before placing a combined order helps confirm both materials can arrive together. That keeps a paving job moving on schedule instead of waiting on a second delivery.
Particularly on DIY jobs, Wilton Sand & Soil’s yard sees the same few mistakes come back again and again. The most frequent one involves a customer who skipped the road base entirely, assuming firm-feeling soil was enough. They usually return months later, once the pavers have started sinking unevenly.
Another common issue involves using brickies sand or leftover garden sand in place of proper bedding sand. Both are too fine for the job, since neither compacts or drains the way washed bedding sand does under a paver. Ordering the right product for each layer from the start, rather than substituting whatever happens to already be on site, saves a costly do-over later.
Finally, a third mistake shows up on sloped blocks. Homeowners sometimes skip extra edge restraint, assuming the road base and sand alone will hold the pavers in place on a slight grade. Without a solid edge, both layers can slowly wash or creep downhill over time, taking the pavers with them.
Getting the base and bedding layers right the first time is what separates paving that lasts from paving that needs redoing within a year. Wilton Sand & Soil’s team has spent two decades helping Sydney and Southern Highlands homeowners, landscapers and builders get both layers right. Get a quote today for your road base, bedding sand, and pavers, all from one local yard.
Yes. Natural soil compacts and shifts differently to a properly graded road base, even when it feels solid underfoot. Skipping this layer is the most common reason DIY paving sinks or shifts within the first year.
The same bedding sand used underneath the pavers usually gets brushed into the joints afterwards. It locks the pavers together and stops them shifting under foot or vehicle traffic.
Brickies sand is a specific type of coarser, washed sand often used as bedding sand for paving. Both terms overlap in practice — the key point is using a coarse, washed sand rather than fine garden sand.
Most residential jobs use 50mm to 100mm of compacted road base, with driveways at the deeper end since they carry vehicle weight rather than just foot traffic.
Yes. Recycled aggregate, made from crushed concrete and masonry, performs comparably to standard road base in most residential paving once compacted properly, and it’s a more sustainable option.